Mine / resource · Germany

Project Ludwig (Vulcan Phase 2)

DevelopmentNot yet verifiedAs of 25 Oct 2026
Owner
Vulcan Energy Resources via Vulcan Energie Ressourcen GmbH (licence holder, Ludwig and Therese licences); KfW holds 14.49% of Vulcan Energie Ressourcen GmbH since Financial Close (May 2026)
Listed via
VUL.AX
Product
Li2CO3
Deposit type
Geothermal brine
Capacity
PFS (Sep 2026): 21.1 ktpa battery-grade Li2CO3 plateau, 517 kt over 30-yr life; 3,125 GWh/yr renewable heat; capex €1.26bn; FID after Lionheart start-up
≈ 21.1 kt LCE/yr (planned)
Location
49.48°, 8.41°

Ludwigshafen region, Upper Rhine Valley Brine Field, ~60 km north of Lionheart. Location = centre of the Ludwig licence (457286 E, 5480854 N, ETRS89 UTM 32N, PFS JORC Table 1 p. 39); the PFS gives no plant coordinates, so the operation is not located to within 1 km.

Ownership structure

Effective economic interest of listed owners · As of 25 Oct 2026
Vulcan EnergyVUL.AX85.51%Other / unlisted14.49%Project Ludwig (VulcanMine / resource

Attributable capacity

Listed ownerStakekt LCE/yr
Vulcan Energy VUL.AX85.51%≈18

Structure: Vulcan Energy Resources via Vulcan Energie Ressourcen GmbH (licence holder, Ludwig and Therese licences); KfW holds 14.49% of Vulcan Energie Ressourcen GmbH since Financial Close (May 2026). 14.49% is held by unlisted or untracked owners.

Value chain

Owners, buyers and the refineries on Li3atlas they feed · As of 25 Oct 2026
Mine / resourceProject Ludwig (Vulcan Phase 2)PFS (Sep 2026): 21.1 ktpa battery-grade Li2CO3 plateau, 517 kt over 30-yr life; 3,125 GWh/yr renewable heat; capex €1.26bn; FID after Lionheart start-up

Country risk · Germany

Policy risk: Low As of 24 Oct 2026

Change history

Approved changes with their source · As of 25 Oct 2026
DateFieldChangeSource
25 Oct 2026Notesnew: Added to Li3atlas: Project Ludwig (Vulcan Phase 2)

Report an error