NYSE/Nasdaq · RIO

Rio Tinto

2 producing2 ramping1 construction3 development2 exploration2 curtailed / c&m

≈ 184 kt LCE/yr attributable

As of 24 Oct 2026

Share price

NYSE:RIO

Prices are delayed (end of day for Shanghai and Shenzhen). Hong Kong listings show the company's mainland A-share where it has one.

Capacity by value-chain step

Attributable kt LCE/yr, by stage · As of 24 Oct 2026
Upstream: mines and brines184 kt LCE/yr
Producing 58Ramping 18Development 25Curtailed / C&M 83
Downstream: refineries15 kt LCE/yr
Construction 15

Self-sufficiency (upstream ÷ downstream) 1221% · Net seller of lithium units (mines exceed own refining)

Not quantified yet: Galaxy (James Bay) (no capacity on file); Whabouchi (Nemaska Lithium) (no capacity on file); Salar de Maricunga (Codelco JV) (no capacity on file); Salares Altoandinos (ENAMI JV) (no capacity on file)

Lithium assets on Li3atlas

12 assets · As of 24 Oct 2026
AssetCountryStageOwnershipCapacityAttrib. kt LCELanded US$/t LCEVerified
Upstream: mines and brines · subtotal 184 kt LCE/yr attributable (58 producing, 18 ramping, 25 development, 83 curtailed / c&m)
Fénix (Hombre Muerto)ArgentinaProducing100%30 kt LCE/yr after Phase 1A (mid-2024); Phase 1B lifts nominal capacity to ~40 kt LCE/yr30—24 Oct 2026
OlarozArgentinaProducing66.5%Stage 1 17.5 kt LCE/yr; Stage 2 adds 25 kt for 42.5 ktpa LCE total in 203028—24 Oct 2026
RinconArgentinaRamping100%3 ktpa starter plant (R3000) ramping; 57 ktpa expansion under construction, first production 2028, 60 ktpa total3—Pending
Sal de VidaArgentinaRamping100%15 ktpa LCE; first production Q2 2026, plant in commissioning15—Pending
Cauchari (Rio Tinto)ArgentinaDevelopment100%Planning stage: potential 25 kt LCE/yr processing facility, 30-year life; Mineral Resource 6.0 Mt LCE, Ore Reserve 1.1 Mt LCE (30 Jun 2025, 100%)25—Pending
Galaxy (James Bay)CanadaDevelopment100%Probable Ore Reserve 37.3 Mt @ 1.27% Li2O; Mineral Resource (excl. Reserves) 74.0 Mt @ 1.25% Li2O (30 Jun 2025, 100% basis); no capacity stated in Rio filings——Pending
Whabouchi (Nemaska Lithium)CanadaDevelopment53.9%Ore Reserve 26.5 Mt @ 1.32% Li2O; Mineral Resource (excl. Reserves) 26.9 Mt @ 1.45% Li2O (30 Jun 2025, 100% basis); projected 24-year open-pit life; would feed Bécancour (28 ktpa LCE) if selected——Pending
Salar de Maricunga (Codelco JV)ChileExploration49.99%Studies stage (DLE); no capacity disclosed by Rio; JV targets first lithium by end-2030——Pending
Salares Altoandinos (ENAMI JV)ChileExploration51%Pre-feasibility stage (DLE), sole-funded by Rio; no capacity disclosed by Rio——Pending
JadarSerbiaCurtailed / C&M100%~58 kt LCE planned58—24 Oct 2026
Mt CattlinAustraliaCurtailed / C&M100%~0.2 Mtpa SC25—24 Oct 2026
Downstream: conversion and refineries · subtotal 15 kt LCE/yr attributable
Bécancour (Nemaska Lithium)CanadaConstruction53.9%28 ktpa LCE as LiOH (100%); construction >70% complete, slowed in 2026; first production planned 202815—Pending

Headline counts mines and brines only. Refineries are listed with their attributable conversion capacity, which is shown under Downstream above and not added to the headline, so lithium is not counted twice. Cell plants are demand, not supply. Landed cost uses the assumptions set on the cost curve.

Catalyst calendar

Dated milestones with their source · As of 24 Oct 2026

Upcoming

Report an error